§ 7-4. Location of connection to storm drainage system.  


Latest version.
  • The exact point at which a permittee may tie into a town storm drainage system shall be determined by the town manager. This information shall be obtained by the permittee after a permit has been issued and before work commences in the town right-of-way. In all cases where the grade allows and the drain is to be connected to an underground storm drain pipe, said connection shall be made from the top of the storm drain pipe.

(Code 1962, § 613)